GENERAL SCHEDULE

2016 > 2017 

  • Construction of the concrete floating foundation in Saint-Nazaire harbour by Bouygues Travaux Publics (80 workers on site)
  • Erection of the wind turbine onto the floater at quayside
  • Offshore pre-installation of the mooring system

2018 > 2020

  • Towing of the floater/wind turbine assembly to the offshore installation site of Centrale Nantes
  • Commissionning and connection to the grid
  • Demonstration period : monitoring, testing and validation of the outstanding performance of the entire floating system